After not using one of my bikes for a shameful 4 years - I have dragged it out of the garage, charged the battery and splashed some fuel in - wouldnt kick start but bumped straight away. I have built a track bike (which I don't have time to use), am restoring a B2 (which I don't have time to finish) and I am building a black & green C2 - have all the parts (but don't have time to start) - this is the unloved one from the back of the garage.
Just needs a tidyup before selling (provisionaly sold already) refitting Green/White/Blue 1-S bodywork and an engine swap (will put a B-2 back in)
Little tatty in places - paint loss on frame due to a leaky fuel tap and down pipes are a bit rusty - 1-S pipes with DEP cans - but fairly sound with good tyres and good discs - braided hoses all round. Dint in the top of the tank from clumsy move in the garage - but nothing serious
How many more have we all got tucked away in the grarage/shed/back room not being used?
Garage Clearout
-
- Heavy Smoker
- Posts: 320
- Joined: Sat Mar 01, 2008 5:49 pm
- Top-shaggy
- Premix Junkie
- Posts: 1966
- Joined: Mon Oct 31, 2011 11:09 pm
- Location: Derbyshire
-
- Heavy Smoker
- Posts: 320
- Joined: Sat Mar 01, 2008 5:49 pm
Bike #1 is ZXR400 front end and RGV rear end - has race body work at present but I have an unmarked set of standard black and green bodywork to fit - have had ZXR front wheel and RGV rear wheel powder coated in Kawasaki Green but not fitted yet - Last out at Cadwell in April
Bike #2 is a standard KR1-B2 with a complete set of good plastcs (not the ones pictured) - bought for £500 as seen - was running but everything was shagged. I have had the frame and wheels powder coated and just got the crank rebuilt by BDK and rear shock rebuilt by Brooks - speed of build is currently "super slow motion" - have replaced every bearing and seal - it will be completly standard. - As soon as I start joining parts together instead of taking them apart I will start a new thread.
Bike #2 is a standard KR1-B2 with a complete set of good plastcs (not the ones pictured) - bought for £500 as seen - was running but everything was shagged. I have had the frame and wheels powder coated and just got the crank rebuilt by BDK and rear shock rebuilt by Brooks - speed of build is currently "super slow motion" - have replaced every bearing and seal - it will be completly standard. - As soon as I start joining parts together instead of taking them apart I will start a new thread.
-
- Heavy Smoker
- Posts: 320
- Joined: Sat Mar 01, 2008 5:49 pm
For some reason the previous owner chopped the corner off the right hand side pannel (with a meat cleaver by the look) - bought new plastics from ebay france (good place for KR plastics) - those pictured were good from afar but far from good. All parts were working but so badly worn most things needed replacing. Stripped in mid 2008 should be back together next summer - worlds slowest refurb?
Salty
Salty